1. High-risk situations
Do not start up or shut down equipment or installations without using the appropriate written operating procedure.
Any situation where the risk level is temporarily increased is reported. Induced risks are identified and analyzed and compensatory measures are implemented.

2. Traffic: Machine/vehicle/cyclist/pedestrians
Do not exceed the speed limits.
Traffic rules apply inside and outside sites.

3. Body mechanics and tools
Do not carry out work if you do not have the right tools for the job and the environment.
Adopting an inappropriate posture when handling objects or using tools can cause physical harm.

4. Protective equipment
Do not access installations and perform work without wearing general or task-specific personal protective equipment (PPE).
Collective protection is preferred. Individual protection completes preventive measures already taken.

5. Work permits
Do not perform work without a valid work permit.
Any work performed on site requires a permit.

6. Lifting
Do not walk under a load while lifting is taking place.
For any work involving a crane, hoist or other mechanical system, a preliminary risk analysis is required. Equipment must be in good condition. Personnel must be qualified and access to the area must be restricted.

7. Work on powered systems
Do not perform work without checking that the power and product source supply has been rendered inoperative.
Some works require the energy to be safely discharge or the equipment to be purged and vented. In such cases a lockout system is set up to isolate the energy or product according to a specific method.

8. Confined spaces
Do not enter a confined space until isolation has been verified and the atmosphere checked.
Do not enter a confined space (container, tank, well, etc…) without supervision and only after the atmosphere and isolation have been checked.

9. Excavation work
Do not perform excavation work without a valid work permit comprising a map of all underground hazards.
Manual or mechanical excavation work, including dragging rivers and seabeds, can only start after a risk analysis has been performed to identify all hazards in the zone and related precautions have been taken.

10. Working at heights
Do not work at heights without a safety harness when there is no collective protective equipment.
Work at heights is performed on fixed or mobile platforms with a guardrail designed for the task at hand.
Work on rooftops (buildings, reservoirs) is performed only after the roof's solidity has been checked and appropriate protection has been set up.
Ladders are a means of access only; their use must remain exceptional.

11. Change management
Do not make any technical or organizational changes without prior authorization.
Any changes in technique or organization must be the subject of a risk analysis.

12. Simultaneous operations or co-activities
Do not perform simultaneous operations or co-activities without a prior visit.
All work or operations inside a unit in operation can increase risk levels. Interferences due to simultaneous operations or joint-activities must be identified and controlled.